By day 14, the production manager had a working system

Before you decide: two weeks from a signed order to go-live, and what the numbers really said

“It's fair to say I'm a little in love with my BI. It's amazing.”
Ornit, Production Manager, Avrot

On the day the order was signed, the plant's numbers lived in Excel files. At the start of every month, someone exported data from the system, cross-checked it, corrected it and built a deck for management.

Fourteen days later, the production manager had a working system: a dashboard that updates from the system, with numbers she can check against what she knows from the shop floor.

No BI team, no six months of specification, and no surprises.

Before you decide what to do with a number that looks good, it's worth seeing what it really says. In this article I want to show what went live, what the system revealed, and how it gets done in two weeks. Including what happens before the order is signed, because that's where the secret starts.

Same question, a different number every week

Let's start with a world every plant manager knows.

At the management meeting, the production manager presents the month's figures. Nobody in the room knows the calculation logic: what's included in the number, what's counted, and in which unit. The next week, the same manager presents slightly different figures for the same question, and nobody can explain why.

Then the meeting turns into an argument about the number, instead of a discussion about production.

Behind this there's usually the same picture: an export from the system to Excel, manual cross-checks, and someone who spends the start of every month preparing the deck. The data exists and it's accurate. What's missing is management information you can act on.

Twenty years ago, a system that turns this data into knowledge was a project for very large companies, with an in-house BI team and a budget to match. Today it's within reach of any mid-sized plant. And in two weeks.

What you see on go-live day

Note: to protect the customer's privacy, the screens in this article show a sample plant with demo data. The structure, the measures and the method are the same as what went live.

Good units year to date, against last year
Good units year to date, against last year
OEE and its components by month
OEE and its components by month
OEE by work center, sorted by machine hours
OEE by work center, sorted by machine hours
Downtime hours by stop category
Downtime hours by stop category
Data control: a 0.0 gap against the source system
Data control: a 0.0 gap against the source system

See the demo

We grew 10%. So why not open the champagne?

The first screen shows 2.2 million good units year to date, almost 10% more than last year. Sounds excellent.

But on the same screen, in the corner, there's performance: 85.4%, against a target of 94%, and lower than last year too.

One screen down, you can see where the growth came from: 5.5% more work orders. We did more, we didn't do better. That's a difference an end-of-month Excel almost never shows.

Losses compound in OEE

The measure that answers "is the plant efficient?" is OEE (Overall Equipment Effectiveness). It's made of three components:

  • Availability: what share of the time the machine actually produced, rather than stood idle
  • Performance: whether, while producing, it ran at the standard rate
  • Quality: what share of the output came out good

The losses don't split, they compound: each loss applies to what's left after the previous one. That's why the three components are multiplied:

85.6% availability × 85.4% performance × 99.6% quality = 72.8% OEE

In hours it looks like this: out of every 10 hours the machine is available, 7.3 hours of good product at the standard rate remain. An hour and a half goes to stops, another hour and a quarter to running slower than standard, and almost nothing to quality.

Almost three hours out of every ten are room for improvement, with no new machine and no extra shift. The only question is where they go, and that's what the next screens answer.

Where the money is

Sort the work centers by machine hours and the picture becomes clear. One work center takes a fifth of all the plant's hours, and runs at 70% of standard. Every point you improve there is worth more than any point anywhere else.

The same table also has a work center with an OEE of 120%. No machine runs faster than possible, so 120% isn't an achievement but a loose standard in the system. That's a finding too, and sometimes a more important one: all production planning and pricing rest on these standards.

Why the machine is standing

Of the three components, the biggest gap is in availability: 85.6% against a target of 98%. In other words, the problem isn't how the work is done, but how long the machine stands still.

Open up the stop reasons and it turns out there were about 2,700 downtime hours, 58% of them maintenance. Within maintenance, one machine group alone took 253 hours.

Now you know what to call a meeting about, and with whom. And from here you can drill down to any work center, item, reporter, all the way to the single report. Without asking anyone for an Excel.

Why you can trust the number

Everything I've described is worth something only if you trust the numbers. So the system has a screen whose only job is to check itself: it compares what was reported in the source system with what the reports show. The gap: 0.0.

The reason the gap is zero is the data dictionary. Every business term has one definition, and it's calculated once, in the data warehouse. All the reports read from the same place. Anyone who wants to change a definition changes it in the dictionary and in the data warehouse, not in the report.

How it gets done in two weeks

Now for the question I'm asked most. I want to be completely transparent, because part of the answer happens before the clock starts ticking.

1. The two weeks start before the signature

For there to be a signature, we need to spend time together. And if we're spending time together anyway, the best use of it is to build the foundation of the project.

So the first meeting is a presentation of the system and of us. At the second meeting I ask the customer to bring the Excel files they work with, and together we define the data dictionary: what a good-units report is, in which unit it's reported, what counts as a stop, how you know how many production hours were possible. After that there's a full day at the customer's site, inside the ERP system.

That way, on the day of signing, the organization's data dictionary is already ready. The customer knows exactly what they'll get, and we know exactly what to build. No surprises.

2. We don't start from a blank page

After more than 20 years with Priority and with BI, in a plant that runs on that system, we have an out-of-the-box data warehouse and ready-made dashboards as templates. They've been running for years at other customers, so they've also been tested.

The work in each project is the adjustments. At every customer something different changes: how possible production hours are calculated, how "good" is defined. In the last project, for example, there was an important difference between a defective item, which is still sold, and a rejected item, which isn't. So we defined four business terms: good, defective, quantity for sale (good plus defective) and rejected.

3. Show fast, don't aim for perfect

I don't expect it to be spot on the first time.

So the most important thing is to show the customer their own data as fast as possible. They look for two minutes and say: "Yes, it should be taken from here. Here the definition is different." After two or three iterations like that, the data falls into place.

The surprises that real data always has, like an operation reported twice or a category saved the wrong way, don't hold up the project. They surface in the iteration, because someone who knows the plant sees the number and says "that's not right."

4. Two people, one method

Two people worked on the project: the project manager and me.

What lets a small team work at this pace is a fixed method. The process is backed by written playbooks, which commit everyone to work by the method we've built at the company over more than 20 years. The playbooks don't invent the method. They make sure no step gets skipped.

The work ran on two tracks in parallel:

  • BACKOFFICE: pulling the data from the ERP system, processing it, and storing it in an organizational data warehouse in the customer's business language.
  • FRONT: dashboards first. In the second stage, push reports are added from the same model.

One week on a development server, and the second week on a dedicated server for the customer.

5. Going live in stages

"Going live" doesn't mean the whole organization gets access on one day.

First we go live with the IT manager and the production manager. They use the system themselves, build decks from it, and know the numbers. Only when they feel comfortable do they open it up to the department heads and the CEO.

That way, when a number reaches management, it has already passed the review of the people who know the plant best.

Who it's for

Not every plant is ready to go live in two weeks. Some signs point to organizational readiness:

  1. The data in the ERP is clean. The reports from the shop floor are complete and reliable.
  2. There are management routines run from Excel. You already measure and manage by numbers, only by hand.

If you have Excel files you run the plant by, you're already halfway there. We just connect them to the system, and calculate each business term once.

Why two weeks and not six months

If I had to explain it in one sentence: it takes two weeks because we've already done it at many customers.

We know the business terms, and we know the problems. We have a data warehouse and dashboards tested for years at other customers, and all that's left is to adjust them. And the data dictionary is ready before you've even signed.

Want to check whether your plant can go live in two weeks?

In a 20-minute intro call we'll go through one Excel file you work with today, and see what your data dictionary needs.

Elishai · Compass BI
From data to management information · Your BI Partner

We'll Get Back to You Within One Business Day

Fields marked with * are required. We respect your privacy. Used only to reply. Privacy policy